Chat2Docs Cloud in practice — auditing a 400-page plant maintenance contract

2026-10-25 chat2docs, guide, example

This post runs one real job end-to-end: a maintenance-contract audit. The package: 1 contract draft (86 pages, born-digital PDF), 3 appendices (scanned at 300 DPI), 1 pricing schedule (Excel), and the client's old service reports.

Step 1 — Build the collection

Open Chat2Docs Cloud, sign in, create a collection "ACME maintenance 2026", and drop all six files in. Scans are OCR'd at ingest — the console shows per-file progress. The Excel pricing schedule goes into the same collection so contract clauses and prices can be cited together. Total ingest for this package: about three minutes.

Step 2 — Ask the audit questions

Q1 — liability: "What is the rectification period for defects, and which clause defines it?"

30 days from notification, per clause 8.2. Extensions only by written variation. (contract-draft.pdf, p. 21)

Q2 — cross-file check: "Does the pricing schedule's penalty rate match the contract's?"

No. The contract sets 0.5%/week of the affected item value (clause 15.1, p. 44); the schedule lists 0.3%/week (pricing-schedule.xlsx, row 12).

That mismatch — caught because both files live in one collection — is exactly the class of error this console exists for.

Q3 — scan search: "What spare-parts lead time is promised?"

10 working days for stocked items, 45 for imported (appendix-B-scan.pdf, p. 7 — cited to the page image, verified against the scan).

Q4 — not-in-documents test: "What is the contractor's safety rating?"

Not stated anywhere in this collection.

No hallucinated rating — the engine says so plainly.

Q5 — follow-up with session memory: "Which items does that 45-day lead time apply to?"

Imported items only; the appendix lists 14 (appendix-B-scan.pdf, p. 8).

No need to re-upload or re-explain — the follow-up carries the context.

Q6 — web source: paste the client's maintenance FAQ URL into the same collection, then: "Does the FAQ's response-time SLA match the contract?"

No — FAQ promises 4h response, contract 8h (faq.html vs contract p. 12).

Step 3 — Turn answers into deliverables

Ask "summarize the five contract-vs-schedule mismatches as a table," then use Slide deck to generate a 16:9 deck of the findings for the client meeting. Each slide keeps its citations.

Why citations change the workflow

An auditor's job isn't reading — it's verifying. With cited answers the verification is one click (see the highlighted passage) instead of a re-search. Six questions above took about four minutes; the manual equivalent is an afternoon.

Feature checklist used in this example

  • Multi-format ingest: PDF + scans (OCR) + Excel + URL, one collection
  • Page-level citations with highlighted evidence
  • Honest "not in your documents" answers
  • Session memory across follow-ups
  • Answer → dashboard / 16:9 slide deck export

Reproduce it yourself — exact input, exact output

Input 1 — contract-test.txt (download, then upload as-is):

8.2 Rectification. The Contractor shall rectify defects notified within
30 days of notification. Extensions only by written variation.
15.1 Delay damages. 0.5% per week of the affected item value, capped at 10%.

Input 2 — pricing-test.csv (download):

item,penalty rate
Foundation works,0.3%/week

Steps: upload both into one collection → ask, in order:

You type You get (with citation)
What is the rectification period for defects? "30 days from notification, per clause 8.2" (contract-test, p. 1)
Does the pricing schedule's penalty rate match the contract? "No — contract 0.5%/week (clause 15.1) vs schedule 0.3%/week (pricing-test, row 1)"
What is the contractor's safety rating? "Not stated in this collection."

That third row is the point: no invention, just an honest miss.

Try it on your own package: open the console, or read the step-by-step guide.